Projects Department has started the work of the Project of :
( Qurainat , PWD Project . ph.2 E-house HVAC System Completion Works ) on Wednesday , 24 / July / 2019 for Rumaila Operating Organization – ROO in South Rumaila Oil Field:
Activities as follows but not limited to :
# Brazing all tubes connections between units ,
# Cleaning the tubes by Freon R11 ,
# Pressure Leak Test and drying by N2 ,
# Vacuum of all system tubing ,
# Charging with Freon R 410 A ( NOT sure if the condenser units filled with Freon R 410 A , we will check during the work ) ,
# Completion of insulation of jointing points ( Materials put in this CTR – Foster Coating considered , other insulation materials are available in site ) ,
# Pipe supports ( concrete blocks will be supplied by ROO ) ,
# fit up, joint preparation, soldering, pressure/leak testing, purging and charging with approved refrigerant gas of the refrigerant piping (cooper).